您好,歡迎訪問禹城泰瑞彩鋼復合板加工廠!

服務熱線

18765446878

熱門關鍵詞:禹城彩鋼廠,禹城彩鋼復合板,禹城鋼結構板房 彩鋼板房

工地工程板房搭建有哪些施工要求

來源:http://www.cygpw.cn 日期:2022-11-02 發布人:
工程板房安裝須具有在技術監督備案才能進行施工,并且工程板房的生產企業,應提供完整的建筑結構安裝圖紙、產品出廠合格證等。那么,工地濟南工程板房搭建有哪些施工要求?下面跟小編一起來了解一下!
The installation of engineering plank houses can only be carried out after being filed in the technical supervision, and the manufacturer of engineering plank houses shall provide complete building structure installation drawings, product factory certificates, etc. So, what are the construction requirements for the construction of plank houses in Jinan Project? Now let's get to know with Xiao Bian!
一、工地工程板房搭建施工要求
1、 Construction requirements for construction of plank house on construction site
(1)工程板房安裝,應由具有相應資質的施工企業、或生產廠家承擔。安裝單位應根據合同文件、安裝圖紙以及相關標準編制安裝施工方案,并按方案組織實施。
(1) The installation of engineering plank houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)工程板房層數多不應超過2層,每層建筑面積不應超過300㎡,并且大于200㎡時,其疏散樓梯的數量不應少于2部。房間門樓梯的大距離不應大于25m,樓梯的凈寬不應小于1.1m。宿舍房間的建筑面積不應大于30㎡,房間門應朝疏散方向開啟。
(2) The number of floors of the project plank house shall not exceed 2, and the building area of each floor shall not exceed 300 m2, and when it is more than 200 m2, the number of evacuation stairs shall not be less than 2. The large distance from the room door to the stair shall not be greater than 25m, and the clear width of the stair shall not be less than 1.1m. The building area of the dormitory room should not be more than 30 m2, and the room door should be opened towards the evacuation direction.
(3)工程板房安裝完成后,應由安裝單位進行自檢,經自檢合格后應由施工總承包單位組織監理單位、使用單位、安裝單位進行聯合驗收,合格后方可交付使用。
(3) After the installation of the prefabricated house, the installation unit shall conduct self inspection. After the self inspection is qualified, the general contractor shall organize the supervision unit, the user and the installation unit to conduct joint acceptance, and the house can be delivered for use only after it is qualified.
濟南工程板房
二、工程板房硬性要求——防火
2、 Hard requirements for engineering board room - fire protection
(1)所有臨時工程板房材質須為新型阻燃材料,臨時工程板房建筑層數都不超過2層,并按要求設置疏散樓梯。
(1) All temporary project plank houses must be made of new flame retardant materials. The number of floors of temporary project plank houses shall not exceed 2, and evacuation stairs shall be set as required.
(2)臨時工程板房防火部位須配置合格、有效、數量充足的滅火器材,并專人負責定期檢查、維護、保養。
(2) Qualified, effective and sufficient fire fighting equipment shall be provided at the key fire prevention parts of the temporary project plank house, and special personnel shall be responsible for regular inspection, maintenance and repair.
(3)臨時工程板房用電須符合《施工現場臨時用電技術規范》要求,宿舍、辦公用房內不允許使用大功率電器和私拉亂接電線等。
(3) The electricity used in the temporary project board room must comply with the requirements of the Technical Code for Safety of Temporary Electricity Use on Construction Site. It is not allowed to use high-power electrical appliances and connect wires without permission in the dormitories and office rooms.
(5)臨時工程板房搭設完畢后,要經過建設、監理、施工單位及生產廠家對臨時用房的結構性能、室內用電、消防設施等共同進行驗收,驗收合格后方投入使用。
(5) After the erection of the temporary project plank house, the construction, supervision, construction unit and manufacturer shall jointly check and accept the structural performance, indoor electricity, fire fighting facilities, etc. of the temporary house, and put it into use after passing the check and acceptance.
(6)不得攜帶易燃易爆物品進入宿舍、辦公用房、會議室等人員密集的地方。
(6) Inflammables and explosives shall not be carried into the dormitory, office space, meeting room and other crowded places.
工地工程板房搭建有哪些施工要求?我們從兩大方面來為您講解了這個問題,您在搭建時要多注意細節問題,保障工程的質量才行。更多相關內容就來我們這里http://www.cygpw.cn咨詢了解吧!
What are the construction requirements for the construction of plank houses on the construction site? We explained this problem to you from two aspects. You should pay more attention to the details when building to ensure the quality of the project. Come here for more information http://www.cygpw.cn Ask and understand!

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

主站蜘蛛池模板: 【连江县榕彩涂料有限公司】官方网站 | 都江堰招聘网-都江堰人才网 都江堰人事人才网 都江堰人才招聘网 邢台人才网_邢台招聘网_邢台123招聘【智达人才网】 | 飞象网 - 通信人每天必上的网站 全球化工设备网—化工设备,化工机械,制药设备,环保设备的专业网络市场。 | 澳门精准正版免费大全,2025新澳门全年免费,新澳天天开奖免费资料大全最新,新澳2025今晚开奖资料,新澳马今天最快最新图库 | 车充外壳,车载充电器外壳,车载点烟器外壳,点烟器连接头,旅行充充电器外壳,手机充电器外壳,深圳市华科达塑胶五金有限公司 | 深圳装修_店面装修设计_餐厅设计_装修全包价格-尚泰装饰设计 | 合肥制氮机_合肥空压机厂家_安徽真空泵-凯圣精机 | 东亚液氮罐-液氮生物容器-乐山市东亚机电工贸有限公司 | 信阳网站建设专家-信阳时代网联-【信阳网站建设百度推广优质服务提供商】信阳网站建设|信阳网络公司|信阳网络营销推广 | 西子馋火锅鸡加盟-太原市龙城酉鼎餐饮管理有限公司 | 车件|铜件|车削件|车床加工|五金冲压件-PIN针,精密车件定制专业厂商【东莞品晔】 | 二次元影像仪|二次元测量仪|拉力机|全自动影像测量仪厂家_苏州牧象仪器 | 锤式粉碎机,医药粉碎机,锥式粉碎机-无锡市迪麦森机械制造有限公司 | 科研ELISA试剂盒,酶联免疫检测试剂盒,昆虫_植物ELISA酶免试剂盒-上海仁捷生物科技有限公司 | 武汉天安盾电子设备有限公司 - 安盾安检,武汉安检门,武汉安检机,武汉金属探测器,武汉测温安检门,武汉X光行李安检机,武汉防爆罐,武汉车底安全检查,武汉液体探测仪,武汉安检防爆设备 | 薄壁轴承-等截面薄壁轴承生产厂家-洛阳薄壁精密轴承有限公司 | 【德信自动化】点胶机_全自动点胶机_自动点胶机厂家_塑料热压机_自动螺丝机-深圳市德信自动化设备有限公司 | 重庆中专|职高|技校招生-重庆中专招生网 | 分光色差仪,测色仪,反透射灯箱,爱色丽分光光度仪,美能达色差仪维修_苏州欣美和仪器有限公司 | 贝壳粉涂料-内墙腻子-外墙腻子-山东巨野七彩贝壳漆业中心 | Safety light curtain|Belt Sway Switches|Pull Rope Switch|ultrasonic flaw detector-Shandong Zhuoxin Machinery Co., Ltd | 广州云仓代发-昊哥云仓专业电商仓储托管外包代发货服务 | 防爆电机_ybx3系列电机_河南省南洋防爆电机有限公司 | 冲锋衣滑雪服厂家-冲锋衣定制工厂-滑雪服加工厂-广东睿牛户外(S-GERT) | 中高频感应加热设备|高频淬火设备|超音频感应加热电源|不锈钢管光亮退火机|真空管烤消设备 - 郑州蓝硕工业炉设备有限公司 | 广州中央空调回收,二手中央空调回收,旧空调回收,制冷设备回收,冷气机组回收公司-广州益夫制冷设备回收公司 | 同学聚会纪念册制作_毕业相册制作-成都顺时针宣传画册设计公司 | 紫外线老化试验箱_uv紫外线老化试验箱价格|型号|厂家-正航仪器设备 | 碳纤维复合材料制品生产定制工厂订制厂家-凯夫拉凯芙拉碳纤维手机壳套-碳纤维雪茄盒外壳套-深圳市润大世纪新材料科技有限公司 | 贝壳粉涂料-内墙腻子-外墙腻子-山东巨野七彩贝壳漆业中心 | 鲁尔圆锥接头多功能测试仪-留置针测试仪-上海威夏环保科技有限公司 | 杜甫仪器官网|实验室平行反应器|升降水浴锅|台式低温循环泵 | 杭州ROHS检测仪-XRF测试仪价格-百科 | 福建省教师资格证-福建教师资格证考试网| 【直乐】河北石家庄脊柱侧弯医院_治疗椎间盘突出哪家医院好_骨科脊柱外科专业医院_治疗抽动症/关节病骨伤权威医院|排行-直乐矫形中医医院 | 礼至家居-全屋定制家具_一站式全屋整装_免费量房设计报价 | 专业的压球机生产线及解决方案厂家-河南腾达机械厂 | 塑胶跑道_学校塑胶跑道_塑胶球场_运动场材料厂家_中国塑胶跑道十大生产厂家_混合型塑胶跑道_透气型塑胶跑道-广东绿晨体育设施有限公司 | 无线遥控更衣吊篮_IC卡更衣吊篮_电动更衣吊篮配件_煤矿更衣吊篮-力得电子 | 上海道勤塑化有限公司 | 加热制冷恒温循环器-加热制冷循环油浴-杭州庚雨仪器有限公司 |