禹城彩鋼廠:彩鋼板安裝要求和規范有哪些呢?

來源:http://www.cygpw.cn 日期:2024-09-21 發布人:

  一、場地核實??

  1、 Venue verification??

  在潔凈地面上初次處理之后,設備定位

  After initial treatment on a clean floor, equipment positioning02

  按設備定位、設計圖紙對隔墻放線定位

  Positioning of partition walls according to equipment positioning and design drawings

  確定現場尺寸是否與圖紙尺寸、

  Determine if the on-site dimensions match the dimensions on the drawing

  設備位置有相沖突的地方;

  There are conflicting locations of the equipment;

  ?

  ?

  對現場地面的水平進行核實

  Verify the level of the ground on site

  看波動是否較大

  Check if the fluctuations are significant

  是否有必要對彩鋼板墻體底部整體校平

  Is it necessary to level the bottom of the color steel plate wall as a whole

  二、安裝要求

  2、 Installation requirements

  (1)槽鋁固定固定槽鋁前必須先放線定位

  (1) Before fixing the slot aluminum, it is necessary to lay out the wire for positioning

  偏差不能超過5mm

  The deviation cannot exceed 5mm

  槽鋁用M5x30抽心鋁拉釘固定

  The groove aluminum is fixed with M5x30 center aluminum rivets

  間接不超過300mm有門洞位置須設置雙拉釘

  Double pull nails must be installed at doorways with an indirect distance not exceeding 300mm

  間隔不超過50mm

  Interval not exceeding 50mm

  (2)T型吊梁固定吊碼沿放線位置定位間距不超過1.20mT型梁與連接彩鋼板固定時

  (2) When fixing the T-beam with the hanging code along the laying out position, the positioning distance should not exceed 1.20m

  必須用角鋁或角鐵壓緊不得留有空隙壓固體必須在兩塊彩鋼板連接縫之上

  It must be compressed with angle aluminum or angle iron without leaving any gaps. The compressed solid must be above the joint between the two color steel plates

  (3)風口安裝天花上的風口安裝要按圖紙施工

  (3) The installation of air vents on the ceiling should be carried out according to the drawings

  避開T型梁

  Avoid T-beams

  墻體上的排、回風口安裝要離地200mm

  The installation of exhaust and return air vents on the wall should be 200mm above the ground

  (4)外觀要求整體安裝需平直美觀不得有碰撞刮劃痕跡要到才能撕保護膜板縫連接平實板縫間距3-4mm打膠要滿縫平直不得有縫隙

  (4) Appearance requirements: The overall installation should be straight and beautiful, without any collision or scratch marks. The protective film can only be torn off at the end. The board seam connection should be flat and solid, with a spacing of 3-4mm. Glue should be applied to the full seam, straight and without any gaps

  (5)螺絲固定每一塊頂板與圍護板之間的固定必須有3顆鉆尾螺絲圍護板、立板之間連接處上下各有一顆拉釘固定邊施工邊固定板縫必須垂直

  (5) Each screw fixing between the top plate and the enclosure plate must have 3 drilling tail screws. There must be one pull nail at the connection between the enclosure plate and the vertical plate, and one pull nail at the top and one at the bottom. The plate seam must be vertical while fixing during construction

  (6)門窗安裝

  (6) Installation of doors and windows

  門窗的安裝位置和開啟方向按圖紙要求而定單開門盡量在同一塊彩鋼板上雙開門的中心線盡量在板縫連接處以便切下的彩鋼板做門板門窗的型材連接需嚴密不能有縫隙整體門拐留置尺寸必須統一

  The installation position and opening direction of doors and windows should be in accordance with the requirements of the drawings. For order opening, the center line of the double door should be on the same color steel plate as much as possible, and the center line of the double door should be at the joint of the plate seam for easy cutting. The profile connection of the door panel and window should be tight and there should be no gaps. The overall door corner retention size must be uniform

  (7)內外圓弧固定與彩鋼板連接必須要嚴實外圓弧立柱不駁接內圓弧連接點之間不錯位縫隙嚴實/

  (7) The connection between the inner and outer arc fixation and the color steel plate must be tight. The outer arc column should not be connected, and there should be no misalignment or gaps between the inner arc connection points/

  本文由  禹城彩鋼廠 友情奉獻.更多有關的知識請點擊   http://www.cygpw.cn/   真誠的態度.為您提供為的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from Yucheng Color Steel Factory. For more related knowledge, please click http://www.cygpw.cn/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

主站蜘蛛池模板: 酒吧霸屏软件_酒吧霸屏系统,酒吧微上墙,夜场霸屏软件,酒吧点歌软件,酒吧互动游戏,酒吧大屏幕软件系统下载 | 影合社-影视人的内容合作平台 | 实体店商新零售|微赢|波后|波后合作|微赢集团 | 小型玉石雕刻机_家用玉雕机_小型万能雕刻机_凡刻雕刻机官网 | 安徽控制器-合肥船用空调控制器-合肥家电控制器-合肥迅驰电子厂 安徽净化板_合肥岩棉板厂家_玻镁板厂家_安徽科艺美洁净科技有限公司 | 定量包装机,颗粒定量包装机,粉剂定量包装机,背封颗粒包装机,定量灌装机-上海铸衡电子科技有限公司 | 长沙一级消防工程公司_智能化弱电_机电安装_亮化工程专业施工承包_湖南公共安全工程有限公司 | 二次元影像仪|二次元测量仪|拉力机|全自动影像测量仪厂家_苏州牧象仪器 | 天津热油泵_管道泵_天津高温热油泵-天津市金丰泰机械泵业有限公司【官方网站】 | 上海刑事律师|刑事辩护律师|专业刑事犯罪辩护律师免费咨询-[尤辰荣]金牌上海刑事律师团队 | 成都办公室装修-办公室设计-写字楼装修设计-厂房装修-四川和信建筑装饰工程有限公司 | 沈阳楼承板_彩钢板_压型钢板厂家-辽宁中盛绿建钢品股份有限公司 轴承振动测量仪电箱-轴承测振动仪器-测试仪厂家-杭州居易电气 | 台湾Apex减速机_APEX行星减速机_台湾精锐减速机厂家代理【现货】-杭州摩森机电 | WTB5光栅尺-JIE WILL磁栅尺-B60数显表-常州中崴机电科技有限公司 | 北京公寓出租网-北京酒店式公寓出租平台| 防爆电机生产厂家,YBK3电动机,YBX3系列防爆电机,YBX4节防爆电机--河南省南洋防爆电机有限公司 | 家乐事净水器官网-净水器厂家「官方」 | 钢丝绳探伤仪-钢丝绳检测仪-钢丝绳探伤设备-洛阳泰斯特探伤技术有限公司 | 济南保安公司加盟挂靠-亮剑国际安保服务集团总部-山东保安公司|济南保安培训学校 | 电动车头盔厂家_赠品头盔_安全帽批发_山东摩托车头盔—临沂承福头盔 | 宁夏活性炭_防护活性炭_催化剂载体炭-宁夏恒辉活性炭有限公司 | 玉米加工设备,玉米深加工机械,玉米糁加工设备.玉米脱皮制糁机 华豫万通粮机 | 企业VI设计_LOGO设计公司_品牌商标设计_【北京美研】 | 户外-组合-幼儿园-不锈钢-儿童-滑滑梯-床-玩具-淘气堡-厂家-价格 | 综合管廊模具_生态,阶梯护坡模具_检查井模具制造-致宏模具厂家 | hdpe土工膜-防渗膜-复合土工膜-长丝土工布价格-厂家直销「恒阳新材料」-山东恒阳新材料有限公司 ETFE膜结构_PTFE膜结构_空间钢结构_膜结构_张拉膜_浙江萬豪空间结构集团有限公司 | 清管器,管道清管器,聚氨酯发泡球,清管球 - 承德嘉拓设备 | 水热合成反应釜-防爆高压消解罐-西安常仪仪器设备有限公司 | 办公室家具_板式办公家具定制厂家-FMARTS福玛仕办公家具 | 挨踢网-大家的导航! | 上海办公室装修公司_办公室设计_直营办公装修-羚志悦装 | 耐高温电缆厂家-远洋高温电缆| 湖南印刷厂|长沙印刷公司|画册印刷|挂历印刷|台历印刷|杂志印刷-乐成印刷 | DDoS安全防护官网-领先的DDoS安全防护服务商| 气力输送_输送机械_自动化配料系统_负压吸送_制造主力军江苏高达智能装备有限公司! | 锂辉石检测仪器,水泥成分快速分析仪-湘潭宇科分析仪器有限公司 | 富森高压水枪-柴油驱动-养殖场高压清洗机-山东龙腾环保科技有限公司 | 烟气在线监测系统_烟气在线监测仪_扬尘检测仪_空气质量监测站「山东风途物联网」 | 小程序开发公司-小程序制作-微信小程序开发-小程序定制-咏熠软件 | 北京律师事务所_房屋拆迁律师_24小时免费法律咨询_云合专业律师网 | 下水道疏通_管道疏通_马桶疏通_附近疏通电话- 立刻通 |